PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Block work at Stair -3 Facing South.jpg Connecting copper piping to the 2nd floor VAV Boxes Facing West.jpg Continued laying out block at bathrooms 133-136 Facing West.jpg Installing copper piping at the 3rd floor bathrooms Facing North.jpg Installing sprinkler branches at the 1st floor  Facing West.jpg
Next page Block work at Stair -3 Facing South
Block work at Stair -3 Facing South